×

Warning

JUser: :_load: Unable to load user with ID: 558

پروژه های کلید در دست (EPC)، افزایش ظرفیت و بهینه سازی خطوط شرکت مهندسی پصاکو

  • 25
  • Jul

 

  • For optimizing the granulation line includes :

Designing, manufacturing and construction of a vibrating screen model EVS 550/200-2d (approx Cap. 900 ~ 1100ton/hr)

Sinter Project for Esfahan Steel CO. (ESCO)

  • 22
  • Jul

This project includes designing, manufacturing and Construction of:

  1. Vibrating screen model ECS 450/200-2d (Cap.600ton/hr)
  2. Screen house
  3. Technical building and base plate
  4. Connection chutes
  5. Power panel and inverter

 

  • Fifth Floor , No.115,West Aliali St. , Gisha Ave. , Jalal-e-Al-e Ahmad Exp. Tehran , Iran
  • +982188242351
  • +982188266415
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Projects

Contact Us

  Mail is not sent.   Your email has been sent.
بالا
ما از کوکی ها برای بهبود وب سایت استفاده میکنیم. سیاست کوکی.من از کوکی ها در سایت استفاده می کنم. قبول کردن